Once 360 BOM

Generate one detailed bill of materials (BOM) that comprises all disciplines to support and simplify planning, procurement and production.

Once 360 BOM automatically generates one complete multidiscipline bill of materials with all relevant drawings, specifications and documentation requirements. Bill of materials includes even the finest details, down to terminals, fittings and nuts and bolts.

Get a complete product definition in one multilevel BOM that references documents, both specifications and requirements.

Once 360 BOM has a structure similar to most ERP and PDM systems, which makes for easy extraction and transfer of data between systems.